SLB Contracts delivers Steel Framing System (SFS) installation for contractors and developers who need a trade-led, programme-aware approach. We keep scope clear, set out accurately and install with clean openings and interfaces so follow-on trades can pick up smoothly.
From initial set out (datum, grids and opening positions) to track and stud installation, we work to issued drawings and specification and coordinate early around access, sequencing and tolerances. We keep materials staged and work areas tidy, supporting a straightforward handover to dry lining, M&E and finishing trades.
- datum and grid setting out (line and level)
- clean openings and interface checks
- consistent stud alignment and fixing patterns
- practical sequencing for follow-on trades
- tidy work areas and staged materials
- clear communication from quote to handover
delivery focus
SFS installed with trade-credible detail
We focus on the details that protect programme and finish quality: clear scope, accurate setting out and dependable on-site coordination.
Accurate setting out
We confirm key lines, levels and opening positions early, so SFS installation lands where it should and interfaces stay clean.
Clean interfaces
Trade-led coordination around access, services and tolerances to reduce avoidable clashes and keep follow-on trades moving.
Tidy finish
Materials staged, work areas kept tidy and a straightforward handover, supporting dry lining, M&E and finishing packages.
SFS FAQs
Common questions about SFS installation
If you are pricing an SFS package, these are the questions we get most often. If your scope is complex or time-sensitive, call and we will talk it through.
Issued drawings (GA and details), specification notes, scope boundaries, programme dates, access constraints and any interface responsibilities. If something is unclear, we would rather confirm it early than guess.
Yes. We install in line with the information issued for construction and keep communication direct if we spot clashes, missing details or interface risks that could affect programme.
We start with accurate setting out, then keep openings and key lines checked as we progress. We coordinate around access and sequencing, stage materials sensibly and keep the work area tidy so the next trade can follow on cleanly.
We are based in Stanford le Hope, Essex, and we also support projects beyond the region depending on scope and programme. Share the location and dates and we will confirm what is practical.
Start dates are driven by issued information, access readiness and sequencing with other trades. If you tell us your target dates and constraints, we can advise the quickest route to a clean start on site.